Modula S USAID© Ebola Clinic ETU can be constructed in three days!

Modula S

Fruntside worked with Modula S and USAID© to model, render and animate their state of the art ETU.  The rapid response hospital can be constructed in remote locations within 3 days.

•"Off the Grid" Transportable, Autonomous & Resilient
•7x Improved Thermal Performance Building Envelope
•R-60 Thin Panel Super-Insulation System
•100% PV Solar Microgrid & Battery Storage
•4 x Improved HVAC
•Surface Groundsource Geotherma
•75% Reduction in Water Use
•Greywater Recycling
•Water & Waste Purification Systems
•Anti-bacterial "CuVerro" Surfaces

Rail System

Left 3D Render

Front 3D Render

Right 3D Render